Friday, 3 April 2015

Different types of Costing in Oracle Payroll

Different types of costing in Oracle Payroll


When you define oracle element link; you can select element costing type

- Not costed

Means no costing will be done for that particular element

- Fixed Costed

In Fixed Costed  you can not override at Element entry and assignment level costing segments.

- Costed

Costing will follow the normal costing hierarchy.

- Distributed

If you want to distribute the overhead costing to the other elements.




Oracle Payroll Costing hierarchy

Oracle Payroll Costing Hierarchy


In oracle payroll costing can be set at 5 levels with below priority order.


- Payroll                    = Lowest
- Element Link
- Organization
- Assignment
- Element Entry        = Highest