Different types of costing in Oracle Payroll
When you define oracle element link; you can select element costing type
- Not costed
Means no costing will be done for that particular element
- Fixed Costed
In Fixed Costed you can not override at Element entry and assignment level costing segments.
- Costed
Costing will follow the normal costing hierarchy.
- Distributed
If you want to distribute the overhead costing to the other elements.
No comments:
Post a Comment